Assembly resources

Assembly resources:

  • Assembly at the workshop or on-site
  • Hot- or cold-swap assembly
  • Small and large capacity

Our resources:

  • 3 installation pits
  • 4 10 to 20T overhead cranes
  • 4 2.5 to 10T forklift trucks
  • 1 12m cherry picker
  • 2 bearing heaters
  • 1 63T shrinking press
  • Power units and jacks up to 400T